Break-in
During the test run, perform the break-in
operation in the following 5 stages.
1.
10 minutes
a
at the lowest possible
speed. A fast idle in neutral is best.
2.
50 minutes
b
at 1/2 throttle (approxi-
mately 3,000 r/min) or less. Vary engine
speed occasionally. On an easy-planing
boat, accelerate at full throttle onto plane,
then immediately reduce the throttle to
3,000 r/min or less.
3.
1 hour
c
at 3/4 throttle (approximately
4,000 r/min). Vary engine speed occa-
sionally. Run at full throttle for 1 minute,
the allow about 10 minutes of operation
at 3/4 throttle or less to let the engine
cool.
4.
8 hours
d
at any speed, but avoid oper-
ating at full throttle for more than 5 min-
utes at a time. Let the engine cool
between full-throttle runs. Vary engine
speed occasionally.
5.
After the first 10hours. Use standard pre-
mix ratio of fuel and oil. Refer to page 1-
6.
å
Hours
After test run
1.
Check for water in the gear oil.
2.
Check for fuel leakage in the cowling.
3.
Flush the cooling water passage with
fresh water using the flushing kit and with
the engine running at idle.
Predelivery checks
6F610180
0
1
2
10
6H95G11_01 04.7.14 21:01 Page 13
Summary of Contents for EK40G
Page 1: ...EK40J SERVICE MANUAL 6H9 28197 5G 11 EK40G ...
Page 4: ......
Page 16: ...GEN INFO 1 11 6H95G11 MEMO ...
Page 28: ...2 11 6H95G11 SPEC MEMO ...
Page 103: ...6H95G11 6 4 9 8 7 6 5 4 3 2 1 Special service tools Backlash indicator 90890 06706 ...
Page 122: ...LOWR 6 23 6H95G11 Lower unit Shimming M T 6F660860 ...
Page 199: ......
Page 200: ...YAMAHA MOTOR CO LTD Printed in Japan Aug 2004 0 3 1 E Printed on recycled paper ...