
Manual Ozone Generating System
SMOevo
PLUS
Operation
Manual_SMOevoPLUS_eng_01.2019.doc
page 80 of 179
8.3.2 Starting the Ozone Production
The following picture shows the operating controls:
1.
Identify the setting parameters before starting the ozone production.
2.
Open the cooling water flow valve and set the flow according to the specifications in
Chapter Technical Data
.
3.
Turn the system switch to position I.
4.
The system carries out a system test.