
Manual Ozone Generating System
SMOevo
PLUS
Table of Contents
Manual_SMOevoPLUS_eng_01.2019.doc
page 4 of 179
4
Technical Data .......................................................................................................... 33
4.1
Type and Identification of the System ................................................................ 33
4.2
Operating Data .................................................................................................. 34
4.3
Signal Transfer (example of electrical wiring diagram) ....................................... 35
4.4
Vibrations .......................................................................................................... 41
5
System Description .................................................................................................. 42
5.1
Ozone Generation Principle ............................................................................... 42
5.2
Ozone System Design ....................................................................................... 43
5.3
Process Description of the System .................................................................... 45
5.3.1
Subassembly 01: Gas Supply ............................................................... 47
5.3.2
Subassembly 02: Ozone Generation ..................................................... 50
5.3.3
Subassembly 03: Process Gas Line ...................................................... 51
5.3.4
Subassembly 07: Cooling System ......................................................... 52
5.3.5
Subassembly 34: Ambient air Monitoring .............................................. 56
5.3.6
Subassembly 23: Converter .................................................................. 57
5.4
Options .............................................................................................................. 59
5.4.1
Option WCL (Closed Loop) Cooling Water System ............................... 59
5.4.2
Option WOD (Residual Ozone Destructor) ............................................ 60
5.4.3
Option CP (Custom Positioning) ........................................................... 62
5.4.4
Option FH (Flashing Light Horn)............................................................ 62
5.4.5
Option M1 and M2 Ozone Monitoring .................................................... 62
5.4.6
Option Z1 Nitrogen Boost ...................................................................... 62
5.5
Process Control ................................................................................................. 63
5.5.1
Process Values ..................................................................................... 63
5.5.2
System Control Modes .......................................................................... 63
6
Transport and Storage ............................................................................................. 66
6.1
Safety during Transport and Storage ................................................................. 66
6.1.1
Safety Instructions ................................................................................ 66
6.1.2
Personal Protective Equipment ............................................................. 67
6.2
Requirements for Transport Staff ....................................................................... 67
6.3
Transportation of the Ozone System ................................................................. 67
6.4
Packaging .......................................................................................................... 68
6.4.1
Packaging on Delivery .......................................................................... 68
6.4.2
Packaging during Transport and Storage .............................................. 68
6.5
Storage .............................................................................................................. 68
7
Installation and Initial Start Up ................................................................................ 69
7.1
Installation ......................................................................................................... 69
7.1.1
Safety Instructions ................................................................................ 69
7.1.2
Personal Protective Equipment ............................................................. 70
7.1.3
Requirements for the Installation Staff .................................................. 70
7.1.4
Requirements for Safe Installation ........................................................ 70
7.1.5
Operating Room .................................................................................... 71