Preparing for installation
4-2
Installation Planning Guide
–
Assist in site selection
–
Inspect and approve the site
•
Installation
–
Schedule the delivery of the hardware
–
Monitor installation activities
–
Assist you in ordering any supplies required
–
Configure system parameters
–
Assist with the configuration of input and output profiles
for use with third-party finishing devices
–
Install the DocuPrint system
•
Training
–
Provide initial operator training
–
Provide information and assistance in registering for
Xerox Customer Education classes or obtaining tutorials
•
Service
–
Review preventive maintenance schedules and service
call procedures
–
Provide ongoing maintenance
–
Assist in resolving hardware and software problems
Customer responsibilities
Your responsibilities prior to, during, and after installation of the
DocuPrint NPS/IPS system are to schedule and monitor your
installation activities. Refer to the “DocuPrint NPS/IPS
installation planning checklist” and the “Network preinstallation
checklist” in this chapter for a complete list of responsibilities.
Refer to the “Xerox support services” appendix for information on
services designed to support you prior to, during, and after your
installation.
•
Site personnel
–
Identify the person (or persons) at your site who will be
the primary interface with Xerox.
–
After the installation of your DocuPrint NPS/IPS, there are
a few ongoing tasks that must be performed. These tasks
may include all or some of the following:
•
Meter reading and reporting
Summary of Contents for DocuPrint 4850
Page 8: ...Table of contents viii Installation Planning Guide...
Page 16: ...Safety xvi Installation Planning Guide...
Page 34: ...System overview 1 14 Installation Planning Guide...
Page 44: ...Controller components and options 2 10 Installation Planning Guide...
Page 78: ...Preparing for installation 4 16 Installation Planning Guide...
Page 110: ...Printer specifications and requirements 6 22 Installation Planning Guide...
Page 112: ...Printer specifications and requirements 6 24 Installation Planning Guide...
Page 114: ......
Page 118: ...System connections 7 4 Installation Planning Guide...
Page 124: ...Installation 8 6 Installation Planning Guide...
Page 136: ...Supplies A 12 Installation Planning Guide...
Page 142: ...Supplies A 18 Installation Planning Guide...
Page 152: ...Related publications C 6 Installation Planning Guide...
Page 166: ...DocuPrint NPS IPS on a Novell network D 14 Installation Planning Guide...
Page 174: ...Defining the channel attached printer to the host E 8 Installation Planning Guide...