Introduction ................................................................................................................... 29
5.7.2
Interlocking / Password for control mode ..................................................................... 29
5.7.3
Operating assignment of C.B. control ........................................................................... 29
5.7.4
Changing the operating assignment ............................................................................. 29
5.7.5
Saving the operating assignment ................................................................................. 30
5.7.6
Remote switching on and off of the C.B. ...................................................................... 30
5.7.7
Switching on or off the C.B. via the front panel (LCAL) ................................................ 30
5.7.8
Handling of the control function .................................................................................... 31
5.7.9
Display for the control functions ................................................................................... 33
5.7.10
LED-indication under normal mode .......................................................................... 34
5.7.11
LED-indication auto reclosing conditions (AR) ......................................................... 35
5.8
Requirement on the Main Current Transformers .............................................................. 36
6.
Operation and Adjustments ...................................................................... 37
6.1
Displayed text for parameter settings ............................................................................... 37
6.2
Setting procedure ............................................................................................................. 38
6.3
Parameter levels ............................................................................................................... 39
6.4
System parameters ........................................................................................................... 40
6.4.1
Presentation of Measuring Values as Primary Quantities on the Display (Iprim Phase)
40
6.4.2
Display of residual voltage UE as primary quantity (Uprim/Usec) ................................ 40
6.4.3
Voltage transformer connection for residual voltage measuring (3pha/e-n/1:1) ........ 40
6.4.4
Operation cycle counter ................................................................................................ 40
6.4.5
I2*t Operation cycle counter ......................................................................................... 41
6.4.6
Rated -Frequency ......................................................................................................... 41
6.4.7
Indication of pickup ....................................................................................................... 41
6.4.8
Parameter Set Changeover Switch (P2) ...................................................................... 41
6.5
Protection Parameters ...................................................................................................... 42
6.5.1
Pickup current for phase Overcurrent element ............................................................. 42
6.5.2
Trip Characteristics for the Phase Overcurrent Element (I>) ....................................... 42
6.5.3
Tripping Time or Time Factor for the Phase Overcurrent Element .............................. 42
6.5.4
Fast/Time tripping by switch ON of the CB for the overcurrent element ..................... 43
6.5.5
Reset Mode for the Trip Characteristics in Phase Current Path ................................. 43
6.5.6
Current setting for high set element ............................................................................. 43
6.5.7
Trip-Block for all protection elements ........................................................................... 43
6.5.8
Trip delay for high set element ..................................................................................... 43
6.5.9
Fast/Time tripping by switch ON of the CB for the short circuit element .................... 44
6.5.10
Pickup value for residual voltage (UE) (ER/XR-relay types) .................................... 44
6.5.11
Pickup current for earth fault element (IE>) .............................................................. 44
6.5.12
WARN/TRIP changeover .......................................................................................... 44
6.5.13
Time current characteristics for earth fault element (for E/X-relay types) ............... 44
6.5.14
Tripping Time or Time Factor for the Earth Fault Element ....................................... 44
6.5.15
Fast/Time tripping by switch ON of the CB for the earth fault low set element ....... 44
6.5.16
Reset mode for inverse time tripping in earth current path ...................................... 45
6.5.17
Current setting for high set element of earth fault supervision (IE>>) ..................... 45
6.5.18
Trip delay for high set element of earth fault supervision ......................................... 45
6.5.19
Fast/Time tripping by switch ON of the CB for the earth fault high set element ...... 45
6.5.20
COS/SIN Measurement (ER/XR-relay type) ............................................................. 45
6.6
AR Parameter ................................................................................................................... 45
6.6.1
Number of AR shots ..................................................................................................... 45
6.6.2
Fault time (tF) ............................................................................................................... 45
6.6.3
Dead time (tD) .............................................................................................................. 45
6.6.4
Close impulse time (tCI) ............................................................................................... 46
6.6.5
Reclaim time (tR) .......................................................................................................... 46
6.6.6
Fault time activation ...................................................................................................... 46
6.7
Control functions ............................................................................................................... 47
6.7.1
Block/Trip-time .............................................................................................................. 47
6.7.2
Time delay for ext. Trip ................................................................................................. 47
6.7.3
Dead time for Trip/Restore ........................................................................................... 47
6.7.4
CB failure protection ..................................................................................................... 48
6.7.5
Release of the pickup relay for CB failure protection ................................................... 48
6.8
Interface Parameters ........................................................................................................ 49