1128500
WPC 2000 User Manual
C-4
Option 1 User Inputs
6.
Making sure you are grounded, align the holes in the four corners of the Option 1 board
with the four standoffs on the WPC 2000 Main Processor board (refer to Figure C-1 for
correct placement of board), and slowly push the board down until both connectors are
seated. Then screw the board down, using the Phillips screws provided.
7.
If you are ready to connect auxiliary equipment to the Option 1 board, proceed to the next
section. Otherwise, close the door of the WPC 2000 enclosure or console.
Figure C-1. Option 1 Board Installed on WPC 2000 Main Processor Board
Green
Orange
438 439 440 441 442 443 444 445 446 447
431 432 433 434 435 436 437
448 449 450 451 452 453 454
455 456 457 458 459 460 461 462 463 464
WPC 2000
Option 1 board
Standoffs and
Phillips screws
(4 places)
WPC 2000 Main
Processor board
DSV/Lockout
Relay board
Auxiliary E-Stop
Relay board
(Optional)
Summary of Contents for wpc 2000
Page 91: ...1128500 WPC 2000 User Manual 2 64 Installation ...
Page 191: ...1128500 WPC 2000 User Manual 5 22 Troubleshooting ...
Page 209: ...1128500 WPC 2000 User Manual A 18 Extracts from OSHA and ANSI ...
Page 225: ...1128500 WPC 2000 User Manual G 6 Glossary ...
Page 231: ......
Page 232: ......
Page 233: ......
Page 234: ......
Page 235: ......
Page 236: ......
Page 237: ......
Page 238: ......
Page 239: ......
Page 240: ......
Page 241: ......
Page 242: ......
Page 243: ......
Page 244: ......
Page 245: ......
Page 246: ......
Page 247: ......
Page 248: ......
Page 249: ......
Page 250: ......