9.5
Do a test of the exhaust waste valve
Periodicity
Description
Weeks
1
Duration for performing Preliminary requirements
0.0 man-hours
Duration for performing the Procedure
0.2 man-hours
Duration for performing the Requirements after job completion
0.0 man-hours
Personnel
Description
Specialization
QTY
Engine crew
Basic
1
Support equipment
Description
Part No.
CSN
QTY
None
Supplies
Description
QTY
None
Spare Parts
Description
Part No.
CSN
QTY
None
SAFETY PRECAUTIONS
•
None
PRELIMINARY OPERATIONS
•
The engine load must be less than 70%, or the engine can be stopped.
X52
AA00-8135-00AAA-320A-A
Operation Manual
Do a test of the exhaust waste valve
Winterthur Gas & Diesel Ltd.
- 342 -
Issue 002 2018-11