All information, illustrations and specifications in this manual are based on the latest information
available at the time of publication. We reserve the right to make changes at any time without notice.
61
8.0. Service
8.11. Tool change at multi-
cultivation rail
NOTE
The following chapters "Tool
division" describe the possible
division of the tools. The
illustrations show the view
from above through the service
flaps (B) onto the tool drum
(D) of the multi-cultivation
rail.
After the tool change,
ensure that all loose parts,
in particular, all old tools,
are removed from the tool
drum (D).
Close both service flaps (B)
and screw on with two screws
(C) respectively, lock
washers and shims.
Open the safety valves, left
(A) and right (not
illustrated), on both
telescope cylinders.
Switch on control panel and
adjust.
Lower the container.