All information, illustrations and specifications in this manual are based on the latest information
available at the time of publication. We reserve the right to make changes at any time without notice.
60
8.0. Service
8.11. Tool change at multi-
cultivation rail
ATTENTION:
Carry out the tool change
only when the machine is
attached to the tractor.
The tractor must be shut
down and secured against
accidental starting.
Close the safety valves at
both telescope cylinders to
secure the container against
accidental lowering.
Remove universal shaft from
tractor and set aside.
Raise the container
completely.
Close the safety valves, left
(A) and right (not
illustrated), on both
telescope cylinders.
Raise the multi-cultivation
rail completely and secure
against lowering.
Switch off the control panel
and move the hydraulic
control lever of the tractor
to 0-position to prevent the
machine from moving
unexpectedly.
At both service flaps (B),
release 2 screws (C)
respectively and remove with
snap ring and shim.
Open both service flaps (B)
and lock them in place.