All information, illustrations and specifications in this manual are based on the latest information
available at the time of publication. We reserve the right to make changes at any time without notice.
50
8.0. Service
8.3. Maintenance and inspection list
Bogeys
Area
Maintenance measure
Maintenance
interval
Quadruple swing
bogey
Lubricate the brass bushings
of the swing units
(see 8.4.7.)
100 hrs.
Check the air pressure and
correct if necessary
As needed
Front roller
Area
Maintenance measure
Maintenance
interval
Pedestal bearing
unit
Lubricate pedestal bearing
units left (see 8.4.8.) and
right (see 8.4.9.)
100 hrs.