16
Please Do Not Return This Product To The Store.
Contact your local Wayne-Dalton dealer. To find your local Wayne-Dalton dealer, refer to your
local yellow pages/business listings or go to the
Find a Dealer
section online at
www.wayne-dalton.com
Tools Needed:
flagangle
Top section
Nail
Roller
Vertical track
Roller against
vertical track
Top section
Door width
+3-3/8” to 3-1/2”
Top Section
hammer
Nail
Power Drill
7/16” Socket Driver
Tape Measure
Step Ladder
Place the top section in the opening and vertically
align with lower sections.
Temporarily secure the top section by driving a nail in
the header near the center of the section and bending
it over the top section.
Now flip up hinge leaf against section, fastening
center hinges first, and end hinges last. (Refer to
Step 13).
Position flagangle between 1-11/16” (43 mm) to
1-3/4” (44 mm) from the edge of the door. Tighten
the bottom lag screw. flagangles must be parallel to
the door section.
Repeat for opposite side.
imPoRTaNT:
ThE DIMENSION BETWEEN ThE
fLAGANGLES MUST BE DOOR WIDTh PLUS 3-3/8”
(86MM) TO 3-1/2” (89 MM) fOR SMOOTh, SAfE
DOOR OPERATION.
Complete the vertical track installation by securing
the center jamb bracket(s) and tightening the other
lag screws. Push the vertical track against the rollers
so that the rollers are touching the deepest part of
the curved side of the track (see illustration); tighten
all the track bolts and nuts.
Repeat for opposite side.
14
flagangle
flagangle
1-11/16” To 1-3/4”