14
Please Do Not Return This Product To The Store.
Contact your local Wayne-Dalton dealer. To find your local Wayne-Dalton dealer, refer to your
local yellow pages/business listings or go to the
Find a Dealer
section online at
www.wayne-dalton.com
Tools Needed:
Bottom section
5/16 X 1-5/8”
Lag screws
flagangle
Vertical track
assembly
jamb
Bracket
Bottom section
Vertical
track
Roller
3/8”
to
5/8”
fLAGANGLE
Lag screw Locations
5/16” x 1-5/8”
Lag screw
jamb bracket
Cable
12
vertical Track
3/16” Drill Bit
Power Drill
7/16” Socket Driver
Tape Measure
Level
Step Ladder
imPoRTaNT:
ThE TOPS Of ThE VERTICAL TRACkS
MUST BE LEVEL fROM SIDE TO SIDE. If ThE BOTTOM
SECTION WAS ShIMMED TO LEVEL IT. ThE VERTICAL
TRACk ON ThE ShIMMED SIDE, MUST BE RAISED TO
ThE hEIGhT Of ThE ShIM.
Position the left hand vertical track assembly over
the rollers of the bottom section. Make sure the
counterbalance cable is located between the rollers
and the door jamb. Drill 3/16” pilot holes for the lag
screws.
Loosely fasten jamb brackets and flagangle to the
jamb using 5/16” x 1-5/8” lag screws. Tighten lag
screw securing bottom jamb bracket to jamb, to
maintain 3/8” to 5/8” spacing. hang counterbalance
cable over flagangle.
Repeat for the right hand side.