CARDIO WAVE EXCITE Class & Trend: Service & maintenance manual- rev.2.0
Pagina 7.37
7.17.
DISASSEMBLING THE PRIMARY SHAFT ASSEMBLY
Figure 7.17-1
Carry out the operations described in paragraph
7.7. “Disassembling the guards”.
1.
Push down the pedal on the side of the belt
that is being disassembled, in such a way that
the belt cam is in the position shown in the
figure.
2.
Lock the cam in place by pushing a wrench
or screwdriver behind the belt clamping
block, and into a hole in the frame behind the
cam.
Carry out the operations at steps 1 and 2
on both the cams, to slacken the tension
of the belts.
Figure 7.17-2
3.
Back off the 4 screws
(a)
using a 17mm
wrench.
4.
On the machine frame, mark the position
where the secondary shaft is assembled, as
indicated by the arrows in the example.
5.
Back off the screw
(b)
, using a 17mm
wrench, to slacken the tension of the belt that
connects the primary shaft to the secondary.
Figure 7.17-3
On both side of the machine:
6.
Derail the belt from the pulley
(c)
.
7.
On the machine frame, mark the position
where the bearing (
which hold the primary
shaft
) are assembled, as indicated by the
arrows in the example.
8.
Back off the screws
(d)
using a 19mm,
locking down the nuts on the opposite side
using a 19mm.
9.
Remove the primary shaft assembly from the
two belt pedal lever.
Continued on following page
→
Summary of Contents for CLASS & TREND
Page 1: ...SERVICE MAINTENANCE MANUAL REV 2 0 ...
Page 2: ......
Page 4: ......
Page 50: ...CARDIO WAVE EXCITE Class Trend Service maintenance manual rev 2 0 Pagina 4 6 LIBYA DVB T ...
Page 52: ......
Page 213: ......