
4-10
Maintenance Procedures
2. Use the 2.5-mm Allen wrench to remove the two insulator retaining
screws.
Figure “APPI lamp drive assembly” on page 4-5
.
3. Remove the PEEK insulator from the mounting shaft.
4. Use the O-ring removal kit to carefully remove the lamp bulb sealing
O-ring from inside the end of the mounting shaft.
“Removing O-rings and seals” on page 4-3
.
5. Extract the mounting shaft from the APPI source enclosure side plate.
6. Use the O-ring removal kit to carefully remove the mounting shaft
O-rings from inside the lamp mounting flange aperture.
“Removing O-rings and seals” on page 4-3
.
Lamp bulb sealing O-ring
Mounting shaft O-rings
Lamp mounting flange
APPI source enclosure side plate
Summary of Contents for Quattro Premier XE
Page 14: ...4 Table of Contents...
Page 64: ...4 16 Maintenance Procedures...
Page 73: ...Warnings that apply to all Waters instruments A 9...
Page 82: ...B 4 Materials of Construction and Compliant Solvents...
Page 86: ...Index 4...