Installing
37
2
Figure 2-6 Drying Gas Exhaust Bottle
7.
Route the PTFE waste tubing from the detector’s lower-right corner to a suitable
liquid waste container.
2.3.4 Connecting the Rheodyne Injector (for Manual Injections)
Refer to
for this procedure.
1.
Connect the PTFE waste tube to injector port 5.
2.
Install the needle port fitting onto injector port 6.
3.
Connect the 10-µL injection loop between injector ports 1 and 4.
4.
Connect the LC system tubing to injector port 2.
STOP
Attention:
The instrument requires two separate exhaust systems, one for
nitrogen, the other for the rotary pump. Vent them to atmosphere through
separate exhaust lines. Oil mist can seriously damage the instrument when
the nitrogen exhaust line connects with the rotary pump exhaust line. Your
warranty does not cover damage caused by routing exhaust lines incorrectly.
Summary of Contents for Micromass ZQ 2000
Page 6: ......