58
wallaceperimetersecurity.com
Phone: 866.300.1110
INSTALLING THE KINETIC OPERATOR ON GATE POSTS
Installing the Kinetic Operator on Gate Posts
RH & LH mounting options can be configured by the following steps:
1.
Remove the 4 - 10 x1.5 x 20mm button head screws on the side of the operator that will be mounted
to the gate post. See Figure 2. Discard the screws.
2.
Place the Spacers between the operator and gate post. Align the spacers with the mounting holes.
3.
Slide the clamps over the gate post.
4. Insert and tighten the 4 – 10x1.5 x 140mm hex bolts to secure the operator to the gate post. See
Figure 3.
Figure 2. Operator Mounting Screws
Figure 3. Mounting Operator on Gate Post
Summary of Contents for ALPHA
Page 167: ...Figure 47 Schematic for Kinetic DC 15 Kinetic 1 and Kinetic DC 10F Kinetic 2 Operator s...
Page 168: ......
Page 170: ......
Page 180: ......