
70
wallaceperimetersecurity.com
Phone: 866.300.1110
WIRING AC POWER
Wiring AC Power
Turn off AC power at the source (circuit
breaker panel) before accessing the
wires in the Kinetic junction box.
Follow facility Lock Out/Tag Out
procedures. Make sure both the DC
and AC power switches, on the side of
the Kinetic control box
,
are in the off
position. See Figure 16.
Wiring of gate operators must conform
to the NEC standards and comply with
all local codes. If you plan to connect
to 230VAC power, read the WARNING in
Figure 16. The voltage selector switch
on the AC Power board must be moved
to the 230V position or damage to the
operator will occur and void the Limited
Warranty.
Figure 16. Wiring AC Power
Summary of Contents for ALPHA
Page 167: ...Figure 47 Schematic for Kinetic DC 15 Kinetic 1 and Kinetic DC 10F Kinetic 2 Operator s...
Page 168: ......
Page 170: ......
Page 180: ......