
WAGO-I/O-SYSTEM 750 Configuring via the Web-Based Management System (WBM) 183
750-882 Media Redundancy ETHERNET Controller
Manual
1.5.0
10.12 PLC Info
The WBM page “PLC Info” contains information about the current CODESYS
project. First, this information has to be registered in the CODESYS project under
the menu “Project”
“Project Information”.
Figure 71: WBM page “PLC Info”
Table 51: WBM Page “PLC Info”
Project Info
Entry
Default value
Value (Example)
Description
Title
____
SSL Client Example Name of project
Version
____
1.0.0
Project version
Date
____
15.05.2012 08:50:27 Date and Time of the project
Description
____
Test client
to establish SSL
connections
Description
Author
____
JW
Project author
ID
____
70632
Project ID
Checksum
No checksum
available
Checksum of the boot project on the
fieldbus controller. The checksum is
formed from the read-out data as
unsigned long 32-bit number in little-
endian format and displayed in
decimal. If the file "default.chk" is not
available, "No checksum available"
appears.