Operation 5
BA TH412 * 06/2017 * 4512_5-13_5_Opt_Sonst_en.fm
5-109
Engine oil and hydraulic oil preheating
WARNING
Risk of electric shock
The mains plug is operated with 230 volts.
►
Run the engine and hydraulic oil preheating only in a
dry place.
The machine can be fitted with an engine and hydraulic oil
preheating. It preheats the coolant/hydraulic oil. The
following operating times are recommended depending
on outside temperatures:
Temperature (°C/°F)
Operating time in hours (h)
−20 °C/−4 °F
3 h
-10 °C/14 °F
2 h
-5 °C/23 °F
1.5 h
0 °C/32 °F
1 h
+10°C/50 °F
1 h
Summary of Contents for Telehandler TH412
Page 1: ...Operator s manual Telehandler TH412...
Page 3: ...Legend Original Operator s Manual Version 1 3 Issue 06 2017 Document BA TH412...
Page 10: ...EG 2 BA TH412 06 2017 4512_0 1_Konform_en fm EG Declaration of conformity Notes...
Page 18: ...1 8 BA TH412 06 2017 4512_1 1_Vorwort_en fm 1 Preface Notes...
Page 46: ...2 28 BA TH412 06 2017 4512_2 1_Sicherheit_en fm 2 Safety Notes...
Page 271: ...Maintenance 7 BA TH412 06 2017 4512_7 1_Hinweise_en fm 7 17...
Page 319: ...Maintenance 7 BA TH412 06 2017 4512_7 16_Achsen_en fm 7 65 Fig 163 a b Fig 164 c...
Page 332: ...8 6 BA TH412 06 2017 4512_8_Stoerungen_en fm 8 Malfunctions Notes...
Page 345: ...Technical data 9 BA TH412 06 2017 4512_9_Tech_Daten_en fm 9 13 Load diagram Fig 170...
Page 354: ...9 22 BA TH412 06 2017 4512_9_Tech_Daten_en fm 9 Technical data Notes...
Page 360: ...S 6 BA TH412 06 2017 4512_SIX_en fm S Index...
Page 361: ......