Operation 5
BA TH412 * 06/2017 * 4512_5-10_Anbaugeraete_en.fm
5-53
Coupling hydraulic connections
Preparations
The pressure on the hydraulic connections has to be
released before they can be coupled.
1. Retract the telescopic boom completely.
2. Lower the attachment until it is barely above the
ground.
3. Stop the engine.
4. Move the control lever
6
back and forth several times.
➥
The pressure on the hydraulic connections on the
loader unit is released.
5. Remove the protective caps from the loader unit
connections.
- To do this, press the connections forward together
with the hydraulic hose.
6. Remove the protective caps from the hydraulic
connections of the attachment.
6
Fig. 80
Summary of Contents for Telehandler TH412
Page 1: ...Operator s manual Telehandler TH412...
Page 3: ...Legend Original Operator s Manual Version 1 3 Issue 06 2017 Document BA TH412...
Page 10: ...EG 2 BA TH412 06 2017 4512_0 1_Konform_en fm EG Declaration of conformity Notes...
Page 18: ...1 8 BA TH412 06 2017 4512_1 1_Vorwort_en fm 1 Preface Notes...
Page 46: ...2 28 BA TH412 06 2017 4512_2 1_Sicherheit_en fm 2 Safety Notes...
Page 271: ...Maintenance 7 BA TH412 06 2017 4512_7 1_Hinweise_en fm 7 17...
Page 319: ...Maintenance 7 BA TH412 06 2017 4512_7 16_Achsen_en fm 7 65 Fig 163 a b Fig 164 c...
Page 332: ...8 6 BA TH412 06 2017 4512_8_Stoerungen_en fm 8 Malfunctions Notes...
Page 345: ...Technical data 9 BA TH412 06 2017 4512_9_Tech_Daten_en fm 9 13 Load diagram Fig 170...
Page 354: ...9 22 BA TH412 06 2017 4512_9_Tech_Daten_en fm 9 Technical data Notes...
Page 360: ...S 6 BA TH412 06 2017 4512_SIX_en fm S Index...
Page 361: ......