5-72
BA TH412 * 06/2017 * 4512_5-11_Arbeitsbetrieb_en.fm
5 Operation
Working with the manure forks
1. Lower the manure forks until the tines are parallel to
the ground.
2. Travel into the material.
- Pay attention to the travel speed.
3. Slightly raise the loader unit.
➥
A load is applied to the front axle of the machine.
If the material is solid, such as compacted manure, the
manure forks can be tilted in to loosen the load.
1. Travel to the unloading position in a straight line.
2. Raise the manure forks to the required height only
shortly before reaching the unloading position.
3. Travel forward as far as possible and tilt out the
manure forks.
➥
The load falls out.
Fig. 97
Summary of Contents for Telehandler TH412
Page 1: ...Operator s manual Telehandler TH412...
Page 3: ...Legend Original Operator s Manual Version 1 3 Issue 06 2017 Document BA TH412...
Page 10: ...EG 2 BA TH412 06 2017 4512_0 1_Konform_en fm EG Declaration of conformity Notes...
Page 18: ...1 8 BA TH412 06 2017 4512_1 1_Vorwort_en fm 1 Preface Notes...
Page 46: ...2 28 BA TH412 06 2017 4512_2 1_Sicherheit_en fm 2 Safety Notes...
Page 271: ...Maintenance 7 BA TH412 06 2017 4512_7 1_Hinweise_en fm 7 17...
Page 319: ...Maintenance 7 BA TH412 06 2017 4512_7 16_Achsen_en fm 7 65 Fig 163 a b Fig 164 c...
Page 332: ...8 6 BA TH412 06 2017 4512_8_Stoerungen_en fm 8 Malfunctions Notes...
Page 345: ...Technical data 9 BA TH412 06 2017 4512_9_Tech_Daten_en fm 9 13 Load diagram Fig 170...
Page 354: ...9 22 BA TH412 06 2017 4512_9_Tech_Daten_en fm 9 Technical data Notes...
Page 360: ...S 6 BA TH412 06 2017 4512_SIX_en fm S Index...
Page 361: ......