SurfBeam® 2 Pro Portable Terminal Operations Guide
© 2014 ViaSat, Inc.
Page C-6
All Rights Reserved
ViaSat Proprietary Information
9.
Install the four hex screws on the base of the Feedhorn (torque screws to 35.6 kgf-cm (30.0 in-lbs)) (refer to Figure C-6)
Figure C-6: Reinstalling Feedhorn
10.
Continue with the “Unpack and Assembly” instructions provided with the unit