40-6 Preparing Machine and Work Area
V25/VX30G/VSK25/VSK30G Vacuum Excavators
Look for Evidence of Underground Placement
Visually check for:
•
notices of underground placements
•
manhole covers
•
drop boxes
•
recent trenching activity
Mark Excavation Area
When potholing for non-destructive exposure of underground utilities prior to excavating, trenching, or boring,
coordinate with all local utilities and mapping services. The area of proposed excavation must be marked. The
One-Call system must be contacted and the area marked or cleared. Any underground plant owners not
participating in the One-Call system should be notified and have their underground facilities marked. Use a pipe
and cable locator to search the area to be excavated to determine if unmarked facilities exist, and to help
determine a more precise location of marked facilities. Consult area utility maps or seek advice on non-metallic
pipes such as sewer or storm water lines that may be unmarked.
WARNING:
When exposing utility lines for avoidance in a digging application, verify exposed line is
the correct line. Excavations may contain multiple lines or abandoned lines, as well as the line
intended to be exposed.
Summary of Contents for McLaughlin V25
Page 8: ...This page intentionally left blank...
Page 26: ...This page intentionally left blank...
Page 28: ...This page intentionally left blank...
Page 44: ...This page intentionally left blank...
Page 50: ...This page intentionally left blank...
Page 82: ...This page intentionally left blank...
Page 122: ...This page intentionally left blank...
Page 124: ...This page intentionally left blank...
Page 136: ...This page intentionally left blank...
Page 140: ...This page intentionally left blank...
Page 144: ...This page intentionally left blank...
Page 152: ...This page intentionally left blank...
Page 156: ...This page intentionally left blank...
Page 168: ...This page intentionally left blank...
Page 176: ...This page intentionally left blank...