75-6 Maintenance - 50 Service Hours or Weekly
V25/VX30G/VSK25/VSK30G Vacuum Excavators
W
ATER
P
UMP
O
IL
- I
NITIAL
C
HANGE
(1)
Oil Fill Cap/Dipstick
(2)
Oil Drain
Change oil every 500 hours after initial oil change. Refer to the Water Pump
Operation Manual supplied with the machine for instructions.
WARNING:
Never attempt to change or add oil while water pump is running. Personal injury or
equipment failure will result. Allow unit to cool down before attempting any maintenance.
1
2
Summary of Contents for McLaughlin V25
Page 8: ...This page intentionally left blank...
Page 26: ...This page intentionally left blank...
Page 28: ...This page intentionally left blank...
Page 44: ...This page intentionally left blank...
Page 50: ...This page intentionally left blank...
Page 82: ...This page intentionally left blank...
Page 122: ...This page intentionally left blank...
Page 124: ...This page intentionally left blank...
Page 136: ...This page intentionally left blank...
Page 140: ...This page intentionally left blank...
Page 144: ...This page intentionally left blank...
Page 152: ...This page intentionally left blank...
Page 156: ...This page intentionally left blank...
Page 168: ...This page intentionally left blank...
Page 176: ...This page intentionally left blank...