9 / 77
1
ON
OFF
OFF
OFF
OFF
OFF
OFF
OFF
2
OFF
ON
OFF
OFF
OFF
OFF
OFF
OFF
3
ON
ON
OFF
OFF
OFF
OFF
OFF
OFF
4
OFF
OFF
ON
OFF
OFF
OFF
OFF
OFF
5
ON
OFF
ON
OFF
OFF
OFF
OFF
OFF
6
OFF
ON
ON
OFF
OFF
OFF
OFF
OFF
7
ON
ON
ON
OFF
OFF
OFF
OFF
OFF
8
OFF
OFF
OFF
ON
OFF
OFF
OFF
OFF
9
ON
OFF
OFF
ON
OFF
OFF
OFF
OFF
10
OFF
ON
OFF
ON
OFF
OFF
OFF
OFF
11
ON
ON
OFF
ON
OFF
OFF
OFF
OFF
12
OFF
OFF
ON
ON
OFF
OFF
OFF
OFF
…
…
…
…
…
…
…
…
…
253
ON
OFF
ON
ON
ON
ON
ON
ON
254
OFF
ON
ON
ON
ON
ON
ON
ON
255
ON
ON
ON
ON
ON
ON
ON
ON
POS
(SW2)
BAUD RATE 1
2
BAUD
RATE
(BPS)
1200
OFF
OFF
2400
ON
OFF
4800
OFF
ON
9600
ON
ON
POS
(SW2)
PROTOCOL
3
4
COMM
PTOL
PELCO
(PELCO-P/
PELCO-D)
OFF
OFF
reserved
ON
OFF
reserved
OFF
ON
reserved
ON
ON
Table 2: SWITCH SETTING
3.2. INSTALLATION
Step 1.
Install lower dome.
Line up the mounting screw holes, and install the three mounting screws. Push the lower dome inside the back box.
Step 2.
Install the bracket for wall-mounted dome
Dig four holes on the wall as Pic. 3. Take out the cables from the backward of the bracket. Install the bracket on the wall.
Summary of Contents for VP-ATDN12X
Page 2: ......
Page 11: ...7 77 2 3 TECHNICAL PARAMETERS VP ATDNC12X VP ATDNC12X...