86
DSGH Installation and Operation Guide
Diagnostics and repair
Maintenance and repair
Periodic maintenance schedule
Since the VEGA gauge contains no moving parts, very little periodic
maintenance is required. We suggest this schedule to prevent problems
and comply with radiation regulations:
Table 5.9
Periodic maintenance schedule
Description
Frequency
Procedure
Standardize
As required by process conditions,
usually at least once a month
“Calibration”
chapter
Source
holder
shutter check
Every 6 months unless otherwise
required by the appropriate nuclear
regulatory body
Radiation safety
instructions
shipped
separately with
source holder and
following
instructions
Source wipe
Every 3 years unless otherwise
required by the appropriate nuclear
regulatory body
Radiation safety
instructions
shipped
separately with
source holder and
following
instructions
Summary of Contents for DSGH
Page 2: ......
Page 4: ...2 DSGH Installation and Operation Guide NOTES ...
Page 8: ...6 DSGH Installation and Operation Guide NOTES ...
Page 12: ...10 DSGH Installation and Operation Guide Preface NOTES ...
Page 32: ...30 DSGH Installation and Operation Guide Installation Mounting the DSGH gauge ...
Page 56: ...54 DSGH Installation and Operation Guide Calibration NOTES ...
Page 94: ...92 DSGH Installation and Operation Guide Diagnostics and repair NOTES ...
Page 98: ...96 DSGH Installation and Operation Guide NOTES ...
Page 99: ......