DSGH Installation and Operation Guide
49
Calibration
2 Setting the high density and collecting Cal High data
You must:
• Use the gauge to measure the high process condition.
• Enter the actual density.
This sets the gain of the calibration curve. Perform this procedure before or
after setting the low density.
Before starting the Cal High data collection:
Check that the correct parameters (vessel inner diameter, engineering
units, measurement span, and source type) are correct.
Power up gauge one hour before start of calibration.
Fill vessel or pipe with high process or close the source holder shutter to
simulate high process.
Prepare to draw a sample while the gauge is collecting data.
Procedure 3.5: To set the cal high density
3.
Click
Accept
.
4.
Enter the actual value in engineering units.
5.
Click
OK
.
1.
Select
Calibration | 2 Point Calibration | Cal High Collect
.
2.
Select
Start
.
3.
Click
Accept
.
4.
Enter the actual density process value (from the laboratory)
in engineering units.
5.
Click
OK
.
Summary of Contents for DSGH
Page 2: ......
Page 4: ...2 DSGH Installation and Operation Guide NOTES ...
Page 8: ...6 DSGH Installation and Operation Guide NOTES ...
Page 12: ...10 DSGH Installation and Operation Guide Preface NOTES ...
Page 32: ...30 DSGH Installation and Operation Guide Installation Mounting the DSGH gauge ...
Page 56: ...54 DSGH Installation and Operation Guide Calibration NOTES ...
Page 94: ...92 DSGH Installation and Operation Guide Diagnostics and repair NOTES ...
Page 98: ...96 DSGH Installation and Operation Guide NOTES ...
Page 99: ......