ProStar325 Service Manual
24
Publication date 8 May 2003
2.2
Pre-installation checklist
If you require installation by Varian Field Service, please
complete the checks on this page and send a copy to your local
Varian office.
Preparation
Refer to
section
Chec
k
Work area prepared and meets
requirements
❏
Power supplies meet requirements
❏
The ProStar 325 detector and any
accessories are on site and unpacked.
❏
Computer meets requirements
❏
Windows operating system installed
❏
Operator training is required
❏
All applicable preparations have been completed. Please arrange
for the installation to be completed.
I fully understand that charges may be levied if the installation
by Varian Service personnel is delayed due to facilities not being
prepared in accordance with the information contained in this
manual.
Company name and address:
_____________________________________
____________________________________________________________
Signed:
______________________________________________________
Name:
______________________________________________________
Telephone: __________________________________________________
Preferred installation date:
______________________________________
StockCheck.com
Summary of Contents for ProStar 325 UV-Vis
Page 9: ...ProStar325 Service Manual Publication date 8 May 2003 9 S t o c k C h e c k c o m ...
Page 19: ...ProStar325 Service Manual Publication date 8 May 2003 19 S t o c k C h e c k c o m ...
Page 34: ...ProStar325 Service Manual 34 Publication date 8 May 2003 S t o c k C h e c k c o m ...
Page 71: ...ProStar325 Service Manual Publication date 8 May 2003 71 S t o c k C h e c k c o m ...
Page 72: ...ProStar325 Service Manual 72 Publication date 8 May 2003 S t o c k C h e c k c o m ...
Page 118: ...ProStar325 Service Manual 118 Publication date 8 May 2003 S t o c k C h e c k c o m ...
Page 149: ...ProStar325 Service Manual Publication date 8 May 2003 149 S t o c k C h e c k c o m ...