Fit the new panel cover that comes with the upgrade kit as shown
below.
•
Replace and secure all other panels.
Note:
Once this is complete, check that the new Vis lamp is not causing
any over range errors. Please refer to Diagnostics section, page 120.
5.5
Performance test
Execute the instrument performance (install) tests to check that
the instrument meets specification
1.
Switch on the PC and load the
Verify sof
tware
2.
Click on the
Tests
tab.
3.
Click
Start
to begin the tests.
The software will start the instrument performance tests
required to verify the instrument meets specifications.
StockCheck.com
Summary of Contents for ProStar 325 UV-Vis
Page 9: ...ProStar325 Service Manual Publication date 8 May 2003 9 S t o c k C h e c k c o m ...
Page 19: ...ProStar325 Service Manual Publication date 8 May 2003 19 S t o c k C h e c k c o m ...
Page 34: ...ProStar325 Service Manual 34 Publication date 8 May 2003 S t o c k C h e c k c o m ...
Page 71: ...ProStar325 Service Manual Publication date 8 May 2003 71 S t o c k C h e c k c o m ...
Page 72: ...ProStar325 Service Manual 72 Publication date 8 May 2003 S t o c k C h e c k c o m ...
Page 118: ...ProStar325 Service Manual 118 Publication date 8 May 2003 S t o c k C h e c k c o m ...
Page 149: ...ProStar325 Service Manual Publication date 8 May 2003 149 S t o c k C h e c k c o m ...