
Hardware Installation
2-4
Hardware Installation
•
For example
: If digital video is signal level 1 and digital audio is signal level 2, the
digital video may occupy a lower position in the rack frame.
Note: See Figure 2-2 for an example rack frame layout.
2.
Once your layout is determined, remove the front cover from the Utah-400 and set it
aside.
FIGURE 2-2.
Utah-400 Chassis Mounted in 19" Rack Frame
3.
Remove the shipping braces and set them aside.
4.
Install the Utah-400 chassis' in the 19" rack frame.
Note: The 144 x 144 chassis (with power supplies and PCB's) weighs close to
80 pounds; Utah Scientific recommends a minimum of two persons,
preferably three, to install the chassis in the rack frame. Install all
mounting screws in the front of the chassis; the entire weight of the
router and cables are supported by the chassis side-frames.
a. Determine the height to mount the Utah-400 in the rack frame.
Blank Panel
Utah-400 Digital Audio
Signal Router
Level 2, 3
Utah-400 Digital Video
Signal Router
Level 1
Use these screws to catch the lower
lip of the chassis flange and support
it when the chassis is initially placed
in the rack frame.
Install all screws to
support the Utah-
400 chassis
Install all screws to
support the Utah-
400 chassis
19" Rack Frame
Summary of Contents for Utah-400
Page 1: ...The Utah 400 Digital Routing Switcher 144x144 Systems System Setup and Operation ...
Page 14: ...TOC 6 The Utah 400 ...
Page 18: ...F 4 List of Figures ...
Page 31: ...144x144 Router 1 13 System Configurations FIGURE 1 4 144x144 with Redundant Crosspoints ...
Page 32: ...Introduction 1 14 Introduction ...
Page 66: ...Configuration and Operation 3 10 Configuration and Operation ...
Page 94: ...Utah 400 Components 4 28 Utah 400 Components ...
Page 124: ...Troubleshooting 5 10 Troubleshooting ...