
144x144 Router
2-3
Installing Physical Equipment
4.
Remove the Styrofoam packing from the top of the Utah-400.
5.
Grasp the sides of the Utah-400 and gently pull it up and out of the bottom Styrofoam
packing material and box.
6.
Place the Utah-400 on a stable bench or cart.
7.
With the Utah-400 sitting on a bench or cart, remove the anti-static wrap covering the
router and save for future use.
8.
Move the router to the installation site.
Installing Physical Equipment
Installation of your Utah-400 Video and/or Audio router may require some or all of the follow-
ing steps:
1.
Mounting equipment in rack frames.
2.
Installing MX-Bus cables.
3.
Connecting the AES Reference Signal.
4.
Determining and Setting the Router Signal Level(s).
5.
Installing Audio/Video signal cables.
6.
Connecting power.
7.
Connecting the SMPTE alarm port.
8.
Hardware checkout.
Mounting Equipment in Rack Frames
Installing the Utah-400 Digital Routing Switcher
Use the following steps to install the Utah-400 Systems into the rack frames:
1.
Determine the vertical layout of your frames before you begin the installation. Please
note:
• You may wish to place blank panels between the systems to increase ventilation
and make cabling easier.
• You may wish to install the systems in a way to reflect the priority of audio and video
signal levels.
Summary of Contents for Utah-400
Page 1: ...The Utah 400 Digital Routing Switcher 144x144 Systems System Setup and Operation ...
Page 14: ...TOC 6 The Utah 400 ...
Page 18: ...F 4 List of Figures ...
Page 31: ...144x144 Router 1 13 System Configurations FIGURE 1 4 144x144 with Redundant Crosspoints ...
Page 32: ...Introduction 1 14 Introduction ...
Page 66: ...Configuration and Operation 3 10 Configuration and Operation ...
Page 94: ...Utah 400 Components 4 28 Utah 400 Components ...
Page 124: ...Troubleshooting 5 10 Troubleshooting ...