Maintenance
92
11.2 Maintenance work/Inspection
NOTE
Maintenance work must be performed according to the inspection and mainte-
nance schedule! The nature and amount of wear depends greatly on the individ-
ual use and operating conditions. All specified intervals are therefore guide val-
ues.
The following items must be ensured before carrying out maintenance work:
1. Make a note of the following values on the combustion calorimeter!
•
Wobbe i/s
•
Heating value/combustion value
•
Density
•
mV signals
•
mA signals
•
Internal pressure
•
Differential pressure, Wobbe
•
Differential pressure, air
•
Frequency of the fan control
2. Notify the control room
3. If no default values via PLC are possible, activate "Hold signal" on the combus-
tion calorimeter.
4. Close the shut-off valve on the combustion calorimeter after a leak test.
The nature and amount of wear depends greatly on the individual use and operat-
ing conditions. All specified intervals are therefore guide values.
To guarantee operational reliability, use only genuine spare parts of the manufac-
turer.
Summary of Contents for CWD2005 SPC
Page 1: ...Apr 2016 V1 06 Original Operating Instructions Combustion Calorimeter CWD2005 CWD2005 Plus ...
Page 10: ...Technical data 10 ...
Page 12: ...EU Declaration of Conformity 12 ...
Page 18: ...Safety information 18 ...
Page 22: ...Protective equipment 22 ...
Page 48: ...Description of the work stations operator control elements 48 ...
Page 63: ...Operation 63 Main menu Options Calibration Calibration values are configured in this menu ...
Page 87: ...Operation 87 ...
Page 88: ...Operation 88 ...
Page 90: ...Decommissioning Switching off 90 ...
Page 94: ...Maintenance 94 ...
Page 100: ...Troubleshooting 100 ...
Page 102: ...Service 102 ...
Page 104: ...Disposal 104 ...
Page 106: ...Spare parts 106 ...