
Maintenance
91
11 Maintenance
The quality of measurements by the combustion calorimeter can only be guaran-
teed when the maintenance intervals are adhered to.
11.1 Preparations
Supply lines of linked system components can be closed for maintenance pur-
poses. These must be reopened after the device is put back into service.
DANGER
Risk of serious injury from electricity!
•
Parts of the combustion calorimeter with the adjacent symbol may still carry
voltage even when the main switch is switched off! If required, disconnect
the combustion calorimeter from the supply network!
•
Switch off the main switch, and disconnect the device from the voltage sup-
ply if necessary, and take steps to prevent reconnection!
•
Only skilled electricians are permitted to work on the electrical equipment of
the combustion calorimeter!
WARNING
Risk of serious injury from escaping gases!
•
Before carrying out maintenance work on the combustion calorimeter and
whenever necessary, also bring the the linked system components to a
standstill.
•
Gas connections may only be made by qualified personnel! Guidelines appli-
cable at the installation location must be observed!
•
Incomplete combustion during maintenance operation may cause the ex-
haust air to become polluted with process gas!
•
In the case of toxic gases, the applicable safety provisions must be complied
with.
•
Risk of serious injury from burns caused by burner components!
Before carrying out maintenance work on the burner system, always wait 15
minutes for it to cool down.
Summary of Contents for CWD2005 SPC
Page 1: ...Apr 2016 V1 06 Original Operating Instructions Combustion Calorimeter CWD2005 CWD2005 Plus ...
Page 10: ...Technical data 10 ...
Page 12: ...EU Declaration of Conformity 12 ...
Page 18: ...Safety information 18 ...
Page 22: ...Protective equipment 22 ...
Page 48: ...Description of the work stations operator control elements 48 ...
Page 63: ...Operation 63 Main menu Options Calibration Calibration values are configured in this menu ...
Page 87: ...Operation 87 ...
Page 88: ...Operation 88 ...
Page 90: ...Decommissioning Switching off 90 ...
Page 94: ...Maintenance 94 ...
Page 100: ...Troubleshooting 100 ...
Page 102: ...Service 102 ...
Page 104: ...Disposal 104 ...
Page 106: ...Spare parts 106 ...