6
6
OPERATION
6.1
Overview
6.1.1
Introduction : Operation Modes
6.2
Startup Preparation
6.2.1
Start-up Preparation Sequence in LOCAL Mode
6.2.2
Start-up Preparation Sequence in REMOTE-control Connector
6.2.3
Start-up Preparation Sequence in Other Communication Means
6.3
Start-up
6.3.1
Start-up Sequence in LOCAL Mode
6.3.2
Start-up Sequence in REMOTE-control Connector
6.3.3
Start-up Sequence in Other Communication Means
6.4
Shutting Down
6.4.1
Preparations Prior to Shutting Down Operation
6.4.2
Shutting Down Sequence in LOCAL Mode
6.4.3
Shutting Down Sequence in REMOTE-control Connector
6.4.4
Shutting Down Sequence in Other Communication Means
6.5
Variable Speed Operation
6.4.1
Preparations Prior to Shutting Down Operation
6.4.2
Shutting Down Sequence in LOCAL Mode
6.4.3
Shutting Down Sequence in REMOTE-control Connector
6.4.4
Shutting Down Sequence in Other Communication Means
6.6
Software Operation
6.7
Remote-control Connector
6.7.1
Specification
6.7.2
Pin Assignment
6.7.3
Connector
6.8
Communication Specifications
6.8.1
RS-232C
6.8.2
RS-485
6.8.3
Connector
Summary of Contents for UTM2300 Series
Page 2: ...This page is intentionally left blank...
Page 10: ...viii Location of Label...
Page 20: ...6 1 1 2 Descriptions This page is intentionally left blank...
Page 21: ...2 2IDENTIFICATION AND FUNCTION 2 1 Pump Main Unit 2 2 Control Panel 2 3 External I F Panel...
Page 30: ...16 3 3 3 Controller This page is intentionally left blank...
Page 36: ...22 4 4 3 Standards Fulfilled This page is intentionally left blank...
Page 50: ...36 5 5 5 Notes on Transportation This page is intentionally left blank...
Page 72: ...58 6 6 8 Communication Specifications This page is intentionally left blank...
Page 73: ...7 7GAS PURGE...
Page 82: ...68 8 8 6 Turbo Molecular Pump Return Request This page is intentionally left blank...
Page 95: ...10 10WARRANTY CLAUSES...
Page 98: ...84 10 This page is intentionally left blank...
Page 100: ...Index Index 2 This page is intentionally left blank...