25
TRI93.134.5
www.tritium.com.au
Veefil®isaregisteredtrademarkofTritiumPtyLtd.©2015TritiumPtyLtd
Once the charger has been commissioned
the unit requires re-assembly and closing
prior to operation.
Follow these steps in order to ready
the unit for operation.
1. Remove lifting straps
Carefully remove the lifting straps from
the top slots in the metalwork.
2. Attach Service Cover
Place the Service Cover over the switch
gear and ensure it sits flush with the metal-
work panel prior to fastening. If it doesn’t
sit flush remove and ensure the wiring is
sitting behind the lower face of the switch
gear.
3. Attach Service Hatch over
Service Cover
Check the gasket has not been damaged
or soiled. If using a power drill to fasten
the nuts ensure the correct torque setting
of no greater than 1.0 Nm/8.75lb-in.
If using hand tool, fasten until resistance
felt. Do not over tighten.
4. Attach radiator
•
Angle the radiator and rest on the base-
plate.
•
Re-connect the four way connector.
•
Re-connect cooling hoses and ensure
they are sitting out of the way to avoid
pinching or obstructing the radiator.
•
Locate the radiator onto the fixing
studs.
•
Fasten the radiator onto the studs.
5. Attach front/rear radiator panels
Sit the radiator panel on the base and
against the metalwork, lining up the plas-
tic holes with the bracket nutserts.
Closing checklist