16
TRI93.134.5
www.tritium.com.au
Veefil®isaregisteredtrademarkofTritiumPtyLtd.©2015TritiumPtyLtd
1. Open Crate
Move the crate as close to the
prepared installation site as possible.
Ensure there is enough room to
manoeuvre the lifting apparatus.
Remove/slide out all crate tubes to
disassemble the cardboard crate.
2. Lift Veefil to Vertical
Securely attach the lifting straps at the
top of Veefil to the lifting apparatus and
gently raise to a standing position on the
shipping baseplate.
NOTE: The Veefil is 2050mm/6.72ft tall
on the shipping baseplate.
Do not use the plug holders to assist
lifting the charger at any stage.
Once upright remove all wrapping.
Lifting Straps
Shipping
Baseplate
Unpacking & installation preparation