TAC-7X
MANUAL
S
tep 21. Below figures are samples of inspection criteria.
Step 22. Repeat Steps 14 through 19 for each conductor wire gauge to
obtain necessary specimens; inspect per established procedure.
Step 23. After all specimens have been produced, set the power on off
switch to off and open the sleeve valve.
Step 24. If crimps meet all established parameters, certify the TAC-7X for
production use and establish a periodic verification schedule.
3. Periodic Crimp
Verification
Perform Periodic Crimp Verification in the same manner as the Initial
Crimp Verification. Users may desire to prepare an equipment data
sheet upon which "G" and "T' and pull-test results can be recorded.
Summary of Contents for TAC-7AE
Page 6: ...Figure 1 1 TAC 7X Front View ...
Page 8: ... Figure 1 2 Wire Insertion Through Funnel ...
Page 12: ...Figure2 1 Pneumatic Hook Up ...
Page 14: ... Fiqure 2 4 Track Drop Tube Escapement ESCAPEMENT SYSTEM _ _ _ BR ASSEMBL I TRA ...
Page 18: ... ARBOR COVER PLA TE REMOVED Figure 3 1 Crimp Cylinder Arbor Open ...
Page 20: ... ARBOR COVER PLAT E REMOVED Figure 3 2 Crimp Cylinder Arbor Closed ...
Page 23: ... Crimp Inspection Points Improper Crimps ...
Page 33: ...Figure 6 1 TAC 7X Components ...
Page 34: ...Figure 6 2 Control Box Components Figure 6 2 TAC 7X Components Right View ...
Page 37: ...Figure 6 3 Contact Track Feed Air Adjustments ...
Page 42: ... Figure 6 4 Indenter Plate Removal ...
Page 43: ...HOSE CLAMP CAREFULL Y REMOVE Figure 6 5 Indenter Replacement ...
Page 47: ...Figure 6 6 Indenter Adjustment ...
Page 52: ...TAC 7X Pneumatic Diagram ...