T4900CT
3-31
3.13 NDP Test
To execute the NDP test, select
10
from the DIAGNOSTIC TEST MENU, press
Enter
, and
follow the directions on the screen. The NDP test contains one subtest that tests the
T4900CT’s NDP functions.
Subtest 01
NDP test
This test checks the following functions of NDP:
❑
Control word
❑
Status word
❑
Bus
❑
Addition
❑
Multiplication
Press
Ctrl + Break
to exit.
Summary of Contents for T-Series T4900CT
Page 20: ...T4900CT 2 3 Figure 2 1 Troubleshooting flowchart 1 2 ...
Page 176: ...B 2 T4900CT Figure B 2 Upper system board back ...
Page 178: ...B 4 T4900CT B 2 Lower System Board Figure B 3 Lower system board front ...
Page 179: ...T4900CT B 5 Figure B 4 Lower system board back ...
Page 199: ...T4900CT D 1 Appendix D USA Display Codes Table D 1 USA display codes ...