Smart Manager
Engineering Book
73
-EN
Checking / Changing an Execution Schedule 2
<Checking/Changing an Execution
Schedule in the [Setup] screen>
[1] Checking / changing an
Execution Schedule for each Air
Conditioner or Multiple Air
Conditioners in a Batch
1
Click
to switch to the [Setup] screen.
2
Select the air conditioner(s) that you wish to
check or change the schedule for by any one
of the groups below.
a) All air conditioners in a batch
b) Air conditioners by floor in a batch
c) Air conditioners by tenant in a batch
d) Air conditioners by area in a batch
e) By each air conditioner
In the tree format, place the cursor on the floor
name for the air conditioners (batch by floor) or
the air conditioner name (by each air
conditioner) you wish to operate and right-click.
To set in a batch for all air conditioners, place
the cursor on All Floors and right-click.
The [Operation menu] appears.
3
Click the Change Operating Schedule in the
[Operation menu].
The [Change Operating Schedule] screen
appears.
4
Click the date you wish to check or change.
5
Next, click the No. field of the air
conditioner(s) you wish to check or change
to check or change the setup.
[Setup] screen
1
2-a
2-c
2-d
2-b
2-e
3
[Change Operating Schedule]
screen
4
5
Summary of Contents for Smart Manager
Page 93: ...Smart Manager Engineering Book 93 EN ...
Page 106: ......