(3)
F
an test operation function
This function is provided to change collectively the mode of all the indoor units connected to the same
system
for the fan test operation mode by using switches on the interface P.C. board of the header unit.
<Operation procedure>
NOTE)
The test operation ends after 60 minutes and the operation returns to normal status.
[
A
]
[F.
]
[
B
]
[
–
F]
Power ON
Operation
Operation check
Stop/End
Push the push switch SW4 for 2 seconds or more on the P.C. board.
[Test run] is displayed on the remote controller of
the indoor unit to be operated. Check that
7-segment display [B] on the interface P.C. board
of the header unit changed to [– C]
Match [SW01/SW02/SW03] on the interface P.C.board of the header
unit to [2/5/1]. (7-segment display [A] changes to [F. ].)
Be sure to turn on power of the indoor unit
and then turn on power supplies at outdoor unit side.
Return [SW01/SW02/Sw03] on the interface P.C. board of the header
unit to [1/1/1].
or push the push switch [SW05] for 2 seconds or more.
7-segment display [A]
7-segment display [B]
SW04
SW05
<Rotary switches>
SW01
SW02
SW03
−
1
4
1
−
Summary of Contents for MMY-MAP0806HT7(J)P
Page 306: ...For HT8 J P E HT8 J P TR model 305 ...
Page 307: ...For T8 J P T7 J P T8P SG T8 J P ID T8 J P T model 306 ...
Page 313: ... 312 For HT8 J P E HT8 J P TR model ...
Page 314: ... 313 For T8 J P T7 J P T8P SG T8 J P ID T8 J P T model ...
Page 320: ... 319 For HT8 J P E HT8 J P TR model ...
Page 321: ... 320 For T8 J P T7 J P T8P SG T8 J P ID T8 J P T model ...
Page 350: ......