(1) Cooling test operation function
This function is provided to change collectively the mode of all the indoor units connected to the same system for
the cooling test operation mode, by using switches on the interface board of the header unit.
<Operation procedure>
NOTE)
The test operation returns to the normal operation after 60 minutes.
Power ON
Start
Operation check
[A]
[C. ]
[B]
[ – C]
Stop/End
Be sure to turn on power at the indoor side
before power-ON of outdoor unit.
Set SW01/SW02/SW03 on the interface P.C. board of the header unit
to [2/5/1]. ([C. ] is displayed on 7-segment display [A].)
[Test run] is displayed on the remote controller of
the indoor unit to be operated.
Check that [ – C] is displayed on 7-segment
display [B] on the interface P.C. board of the
header unit.
Press SW04 on the same board for 2 seconds or more.
Return SW01/SW02/SW03 on the interface P.C. board of the header
unit to [1/1/1],
or press the push-switch SW05 for 2 seconds or more.
7-segment display [A]
7-segment display [B]
SW04
SW05
<Rotary switches>
SW02
SW03
SW01
−
1
3
9
−
Summary of Contents for MMY-MAP0806HT7(J)P
Page 306: ...For HT8 J P E HT8 J P TR model 305 ...
Page 307: ...For T8 J P T7 J P T8P SG T8 J P ID T8 J P T model 306 ...
Page 313: ... 312 For HT8 J P E HT8 J P TR model ...
Page 314: ... 313 For T8 J P T7 J P T8P SG T8 J P ID T8 J P T model ...
Page 320: ... 319 For HT8 J P E HT8 J P TR model ...
Page 321: ... 320 For T8 J P T7 J P T8P SG T8 J P ID T8 J P T model ...
Page 350: ......