4 Preparation
4-6
MIRUS Controller, SW 2.03.02, Additional Information Master (en-GB)
4. MIRUS Power up test is in progress.
5. The MIRUS Controller completes Power
up test successfully. In any other case,
the MIRUS Controller will let you know by
messages and give instructions.
Refer to Chapter 7 for more information
about messages during Power up test.
6. MIRUS Controller starts System test
automatically when
•
Power up test has successfully
finished.
•
MIRUS Reflector in Park Bay is
inserted.
•
MIRUS Interface plug is inserted
into receptacle.
In any other case, the MIRUS Controller
will let you know by messages and give
instructions.
Refer to Chapter 7 for more information
about messages during System test.
HW 2.n
SW 2.03.02
One moment please…
HW 2.n
SW 2.03.02
Power up test successful.
HW 2.n
SW 2.03.02
System test active. Please wait…
Summary of Contents for Mirus MC DES
Page 1: ...Additional Information MIRUSTM Controller Software version 2 03 02 Hardware version 2 n...
Page 28: ...1 Introduction 1 22 MIRUS Controller SW 2 03 02 Additional Information Master en GB Notes...
Page 78: ...5 Operation 5 18 MIRUS Controller SW 2 03 02 Additional Information Master en GB Notes...