Thermo Fisher Scientific
Omni FTIR Multi Gas CEMS Instruction Manual
2-1
Chapter 2
System Installation, Start Up and
Shut Down
This chapter provides the recommended procedures and settings for
installing the Omni FTIR Multi Gas CEMS. Installation includes lifting
the FTIR instrument, unpacking and inspection, installing and connecting
the FTIR in the rack and connecting sample and exhaust lines to the
complete system. For details, see the following topics:
●
“
Lifting
” on page
2-1
●
“
Unpacking and Inspection
” on page
2-1
●
“
Site Requirements
” on page
2-2
●
“
Installing the FTIR Analyzer into the Rack
” on page
2-3
●
“
External System Connections
” on page
2-8
●
“
System Startup
” on page
2-10
●
“
System Shut Down
” on page
2-14
When lifting the analyzer, use a procedure appropriate to lifting a large
heavy object, such as bending at the knees while keeping your back straight
and upright. It is desirable to have two or more persons moving the
analyzer.
The FTIR instrument is shipped separately from the rack on its own pallet.
Carefully uncrate and inspect the system in a non-condensing environment
(20–30 °C). Check for possible damage during shipment. Remove crate
from around system. Remove four shipping bolts attaching rack to pallet.
Remove wood from sides of rack. Use fork lift to lift system off pallet or
move manually. Ensure hydrator, filters, and FTIR purge gas generator are
still securely fastened to the side of the rack.
Lifting
Unpacking and
Inspection
Summary of Contents for Omni FTIR Multi Gas CEMS
Page 1: ...Omni FTIR Multi Gas CEMS Instruction Manual Part Number 108004 00 11Apr2013...
Page 4: ...Thermo Fisher Scientific WEEE Compliance...
Page 20: ...Figures xvi Omni FTIR Multi Gas CEMS Instruction Manual Thermo Fisher Scientific...
Page 22: ...Tables xviii Omni FTIR Multi Gas CEMS Instruction Manual Thermo Fisher Scientific...
Page 182: ......
Page 206: ......
Page 216: ......
Page 234: ......