System Installation, Start Up and Shut Down
External System Connections
2-8
Omni FTIR Multi Gas CEMS Instruction Manual
Thermo Fisher Scientific
See the following external system connections.
The sample line from the M&C SP2000-H probe is routed through an
opening on the right site of the system chassis. Connect the circular
connector to the socket marked “Sample Line” on the rear of the
temperature control box. Connect the sample line fitting to the port
marked “Heated Sample Line” on the heated valve/pump assembly.
Figure 2–5.
Rear Panel Terminal Blocks
Connect the sample line wiring to the following terminal blocks on the
electrical panel.
Sample Line Connections (from left to right):
Terminal Block X3
1 = Probe Temperature Alarm Out
2 = Probe Temperature Alarm In
3 = Probe Blowback Valve +
4 = Probe Blowback Valve –
Terminal Block X4
5 = Ground (Green/Yellow)
6 = Neutral (Blue)
7 = Hot (Brown)
External System
Connections
Connect the Sample
Line to the FTIR
Analyzer Cabinet and
Heated Sample Box
Summary of Contents for Omni FTIR Multi Gas CEMS
Page 1: ...Omni FTIR Multi Gas CEMS Instruction Manual Part Number 108004 00 11Apr2013...
Page 4: ...Thermo Fisher Scientific WEEE Compliance...
Page 20: ...Figures xvi Omni FTIR Multi Gas CEMS Instruction Manual Thermo Fisher Scientific...
Page 22: ...Tables xviii Omni FTIR Multi Gas CEMS Instruction Manual Thermo Fisher Scientific...
Page 182: ......
Page 206: ......
Page 216: ......
Page 234: ......