System Installation, Start Up and Shut Down
Installing the FTIR Analyzer into the Rack
Thermo Fisher Scientific
Omni FTIR Multi Gas CEMS Instruction Manual
2-5
The following connections need to be made to the FTIR unit: Purge,
Power, Computer, Pressure, Cell heater and Sample lines (
Figure 2–3
).
Figure 2–3.
Purge and Power Connections
Connect the FTIR
Unit