Preventive Maintenance and Servicing
Sample System Heater Assembly Components
5-84
Omni FTIR Multi Gas CEMS Instruction Manual
Thermo Fisher Scientific
4.
Using the 9/64-inch hex wrench, loosen slightly but do not remove the
5 screws that mount the double coil clamp plate to the heated block.
This will allow some freedom of movement of the copper tubing
(
Figure 5–60
).
Figure 5–60.
Check Valve Replacement
5.
Using the 9/16-inch wrench and the 5/8-inch wrench, loosen the brass
nut that attaches the copper tubing to the inlet of the check valve and
disconnect that tubing.
6.
Using the 9/16-inch wrench and the 5/8-inch wrench, loosen the
stainless steel nut and remove the check valve from the stainless steel
tubing, noting its orientation before doing so.
7.
Using the wrenches, connect the new check valve to the stainless steel
tubing and nut, with the flow arrow pointing toward the tubing.
Tighten until snug.
8.
Using the wrenches, connect the other end of the check valve to the
brass nut with copper tubing and tighten until snug. Some movement
of the copper tubing will be required to get it into the check valve.
Summary of Contents for Omni FTIR Multi Gas CEMS
Page 1: ...Omni FTIR Multi Gas CEMS Instruction Manual Part Number 108004 00 11Apr2013...
Page 4: ...Thermo Fisher Scientific WEEE Compliance...
Page 20: ...Figures xvi Omni FTIR Multi Gas CEMS Instruction Manual Thermo Fisher Scientific...
Page 22: ...Tables xviii Omni FTIR Multi Gas CEMS Instruction Manual Thermo Fisher Scientific...
Page 182: ......
Page 206: ......
Page 216: ......
Page 234: ......