Preventive Maintenance and Servicing
Removing the FTIR
5-34
Omni FTIR Multi Gas CEMS Instruction Manual
Thermo Fisher Scientific
Figure 5–24.
Posts and Keyhole Slots
2.
To re-install, lift the panel and line up the posts to the 6 keyhole slots.
Push the panel against the rack until it is flush using the weight of the
panel to drop it into place.
Use the following procedure to remove the FTIR from the system.
Equipment Required:
Wrench, 9/16-inch and 7/16-inch
Phillips screwdriver
Small Phillips screwdriver
CAUTION
High surface temperatures present. Allow sufficient time to
cool.
▲
1.
Shut down the FTIR and heaters by turning off the FTIR circuit
breaker and the Temperature Control circuit breaker on the breaker
box. Allow it to cool for 1 hour. Turn off all calibration gases and the
air regulator on the right side of the system. Note the pressure so it can
be reset when completed.
2.
Remove the left side panel per procedure “
Removing the Left Side
Panel
” for better accessibility (optional step).
3.
Using the Phillips screwdriver, remove the FTIR cover panel in the
front of the system and the blank panel above it (
Figure 5–25
).
Removing the
FTIR
Summary of Contents for Omni FTIR Multi Gas CEMS
Page 1: ...Omni FTIR Multi Gas CEMS Instruction Manual Part Number 108004 00 11Apr2013...
Page 4: ...Thermo Fisher Scientific WEEE Compliance...
Page 20: ...Figures xvi Omni FTIR Multi Gas CEMS Instruction Manual Thermo Fisher Scientific...
Page 22: ...Tables xviii Omni FTIR Multi Gas CEMS Instruction Manual Thermo Fisher Scientific...
Page 182: ......
Page 206: ......
Page 216: ......
Page 234: ......