![Thermo Scientific 42iQD Instruction Manual Download Page 85](http://html.mh-extra.com/html/thermo-scientific/42iqd/42iqd_instruction-manual_1105143085.webp)
Operation
Settings
Thermo Scientific
42iQD Instruction Manual
3-61
●
Down:
●
Reaction Chamber/Cooler:
Consists of the PMT and PMT base
socket. Each highlights on their own.
●
PMT:
Service interval for PMT.
●
PMT Base Socket:
Service interval for PMT base socket.
●
Converter Cartridge:
Service interval for converter cartridge.
●
Ozonator Assembly:
Service interval for ozonator assembly.
●
Ozone Permeation Dryer:
Service interval for ozone permeation
dryer.
●
Flow System:
Service interval for the flow system components.
●
Pump:
Service interval for pump.
●
Capillary (Sample):
Service interval for capillaries.
●
Capillary (Ozone):
Service interval for capillaries.
●
DC Power Supply:
Service interval for DC power supply.
●
Fan Filter:
Service interval for fan filter.
●
System Components:
Service interval for system components.
●
Purafil:
Service interval for purafil.
●
Charcoal:
Service interval for charcoal.
●
Dri-Rite:
Service interval for dri-rite.
Summary of Contents for 42iQD
Page 1: ...42iQD Instruction Manual NOx Analyzer 119013 00 1Sep2021 ...
Page 2: ......
Page 32: ...Operation Instrument Display 3 8 42iQD Instruction Manual Thermo Scientific ...
Page 184: ......
Page 238: ......
Page 272: ......
Page 284: ......
Page 285: ......