32
215861 REV C
Installation, Outdoor HPO PowerMAX System
The mating cable that connects between the indoor Maintenance Switch Controller and
the system is part number L201061-1. The standard cable length is 100 ft. (30m). See
Figure 2-31
.
Connect the Control Panel End (P1) to Port J3 at the rear panel of the indoor Mainte-
nance Switch Controller, and the Switch Assembly End (P2) to the Switch Control con-
nector of L215628-2 on Maintenance Switch bracket.
2.3 Weatherize Cable Connections
After installation is completed, all cable connectors that will be subject to outdoor envi-
ronmental conditions should be weatherized with self-amalgamating tape or putty to
prevent water intrusion.
Prior to weatherizing a connector, remove all traces of oil or grease from the connect-
or. Ensure that the connector is clean and dry.
Apply the weatherizing material from the plug/socket connector (MS-type) to as close
as possible to the cable sheath. Cover all connector junctions (N-type; SMA) so that no
water can creep into the thread between the plug and socket.
Figure 2-31: Maintenance Switch Controller Cable