Pro Pump Controller (ProCon-100)
Rev3.6
2023/07/17
15/70
Copyright
©
2023 by TAEHA CORP. All Rights Reserved
<Combination Switch>
✽
Power Switch : Controller power
ON/OFF function
✽
Fuse Holder : Small glass tube 3A
(include spare 1ea)
✽
AC Receptacle : Power Cord inlet
AC 100~240V, 50/60Hz Free Voltage
✽
Be sure to provide grounding.
<Air In Port>
✽
Air in port for
∅
6 Air Hose.
✽
Supply clean air filtered through a 5
µ
m air filter,
with moisture removed. (humidity 5% or less)
<Air Out Port>
✽
R
elease the regulator’s regulated pressure
.
✽
Connect the supplied auto-jointer to the air
out.
<Control Connector>
✽
This is connection port between the shot input
signal and the shot end signal.
✽
It uses circle 4 pin connector and outputs the
dispensing signal input and dispensing
completion signal from the outside.
✽
When controlling dispensing operation from
the higher controller to the output junction,
make sure to connect GND and N24(COM) are
connected between the higher controller and
the controller.
✽
When the dispensing is complete, the
operational completion signal is output at
approximately 30msec on purge. The complete
operation signal is output only in time mode.